Getting started

Getting started with LocusPilot

Create a complete website optimized for Google and AI search in a few clicks. This guide walks you through every step from project creation to making changes after generation.

Estimated read time: 8 minutes

Prefer video? Watch the full walkthrough
01

Creating Your First Project

Getting started is simple. Log in to your dashboard and click "New Project" to begin.

New project form in LocusPilot dashboard

What you need to provide:

Required
  • Business Name: The name of your business or client
  • Factsheet: Information about your business (minimum 50 characters)
Optional
  • Website Language: Generate your website natively in one of 10 supported languages (default: English)
    EnglishEspañolPortuguêsDeutschFrançaisPolskiNederlandsBahasa Malaysia简体中文繁體中文

    For English websites, spelling (US/UK/AU) is auto-detected from your business country.

  • Domain Name: If you already have a domain for the site
  • Design Reference: A website URL or HTML to base your design on

70% Deposit Model

Before you submit, a modal shows you the estimated page count and credit cost. We use a 70% deposit model to keep upfront costs low:

1

Deposit (70%): Only 70% of the estimated cost is charged upfront when you submit.

2

Generation: Your website is built with all pages, images, and content.

3

Settlement: When complete, the actual page count is calculated. Any remaining balance is charged (or refunded if lower than estimated). If your balance goes negative, downloads are locked until you top up.

Your Website Estimate modal showing 41+ pages, the credit breakdown, a 47 credit deposit and the remaining balance due on completion
Website estimate· Page count, credit total and the 70% deposit, shown before anything is charged

Why 70%? Our AI estimation may include more pages than actually needed (e.g., blog posts, location pages). The deposit model ensures you only pay for what you get.

02

Writing Your Factsheet

The factsheet is the foundation of your website. Everything the AI generates comes from what you provide here. The more detail you include, the better your site will be.

Quality In = Quality Out

The factsheet is the single most important input for your website. Our AI can only work with what you provide.

  • ✗Sparse factsheet → Generic content that sounds like every other business
  • ✓Data-rich factsheet → Unique, detailed content including all service details, pricing, company history, USPs, and more

What to include:

Services or Products

List all services you offer with descriptions

Pricing

Include price ranges or starting prices if possible

Location

Your address and service areas

Contact Info

Phone, email, business hours

Unique Selling Points

What makes you different from competitors

Company Background

Years in business, certifications, awards

New project form with the business name and factsheet filled in

Research with AI

Not sure what to write? Use the "Research with AI" feature. Enter a competitor's website URL and the AI will research their business and generate a factsheet for you.

Research with AI modal for generating a factsheet from a competitor URL
Important

Always review and rebrand the AI-generated factsheet. Replace the competitor's name, address, and other details with your own information.

03

Choosing Your Design

You can provide a design reference to influence how your website looks. This is optional but helps create a more customized result.

Design Reference Options

URL Mode

Enter a website URL and we will scrape its design. Good for matching an existing brand or competitor style.

Paste HTML

Paste raw HTML and CSS code directly. Useful if you have a specific design you want to replicate.

Design with Google Stitch (Recommended)

Use Google Stitch tool to create a custom design, then import it directly.

Design with Google Stitch modal with a prompt written from the business factsheet, a Copy Prompt button and an Open Stitch button
Design with Google Stitch· We write the Stitch prompt from your factsheet. Copy it, design in Stitch, then paste the code into Sample Design
Sample Design with the Paste HTML tab filled in and Review structure before generation ticked

Generation Engine

Choose the AI engine that powers your website generation. This affects both the quality of content generation and your credit cost.

Smart EngineDefault
Flux Pro: 2 cr/pg (first 10) → 0.5 cr/pg (11+)
Nano Banana: 2 cr/pg (first 10) → 1 cr/pg (11+)

Optimized AI pipeline that delivers excellent results at up to 50% lower cost. Uses a blend of premium and optimized models for the best value.

Recommended for most websites.

Premium Engine
Flux Pro: 3 cr/pg (first 10) → 0.5 cr/pg (11+)
Nano Banana: 4 cr/pg (first 10) → 1 cr/pg (11+)

Full premium AI model for every phase. Higher credit cost but uses the most capable model throughout.

When should you choose Premium?

  • ●Non-English websites — Premium excels at generating content in foreign languages (Malay, Chinese, Spanish, German, etc.) with more natural phrasing and fewer translation artifacts.
  • ●Large, complex or niche industries — If your business has highly specialized terminology (medical, legal, financial), Premium handles nuanced content more accurately.
  • ●Maximum quality with no compromise — When you want the absolute best output and cost is not a concern.

Starter Authority Sites use the Smart engine automatically. This keeps the fixed $20 price accessible while delivering great quality.

Image Model Selection

Choose how your website images are generated. Pricing below reflects the Smart engine (default):

Flux Pro (Standard)
First 10 pages: 2 credits/page
Pages 11+: 0.5 credits/page

Photorealistic images that look professional and clean. Best for most business websites.

Nano Banana (Smart Visual)
First 10 pages: 2 credits/page
Pages 11+: 1 credit/page

Stylized, artistic images. Supports reference images (up to 10) to match your brand style.

Example: A 30-page website (25 billable after the 5 free utility pages) with Smart engine + Flux Pro costs (10 × 2) + (15 × 0.5) = 27.5 credits. With the 70% deposit you pay 20 credits upfront and 7.5 after generation completes.

Image settings with Nano Banana selected, the Premium engine and a reference image added
04

Advanced Settings

The advanced settings section lets you add tracking, custom scripts, and real customer reviews.

Advanced Settings expanded with Google Tag Manager, custom scripts and Google Business Profile fields
Google Tag Manager ID

Add your GTM container ID (like GTM-ABC123) to enable analytics tracking on your site.

Custom Head Scripts

Add scripts that go in the <head> section. Good for meta tags, third-party integrations, or verification codes.

Custom Body Scripts

Add scripts after the opening <body> tag. Useful for noscript fallbacks or chat widgets.

Google Business Profile

Enter your Place ID or Google Maps URL to pull real customer reviews into your site. Click "Verify" to check if reviews are available.

Branding & Visual Customization

Control how your website looks before generation starts. These settings override the AI defaults so your site matches your brand from day one.

Advanced Settings branding block with logo, favicon, image style, blog and location page options
Business Logo (Optional)

Upload your own logo to replace the AI-generated icon in the header. Choose between two display modes:

Logo only (full wordmark)

Your logo image replaces the entire header logo area. Best for landscape/wide logo files that include your business name.

Logo + Business Name

Your icon appears next to the business name text. Best for square icons or logo marks.

If left empty, the system generates an SVG icon automatically.

Already generated your site? You can also upload or replace logos and images later from inside the AI Site Agent chat — see the Attachments guide.

Favicon (Optional)

Upload a square image for your browser tab icon. If you uploaded a square logo above and leave this empty, the system will use your logo as the favicon automatically.

Image Style Preference (Optional)

Describe the visual style you want for all AI-generated images on your site. For example: "warm, natural lighting with earth tones" or "clean, bright studio photography on white backgrounds."

Use the "Suggest with AI" button to auto-generate a style based on your factsheet and design reference. You can edit the suggestion before submitting.

Content Controls

Fine-tune what the AI generates. These settings let you skip sections you don't need or manually specify exactly which location pages to create.

Blog Posts

Auto (recommended) lets the system decide based on your factsheet. Skip disables blog post generation entirely, reducing your page count and credit cost.

Location Pages

Three options to control service area pages:

Auto (recommended)

The system extracts locations from your factsheet automatically.

Manual

Enter your exact location names (one per line). The system creates a page for each one. Useful when the factsheet doesn't list all your service areas.

Skip

No location pages at all. Good for single-location businesses like a cafe or clinic.

05

Understanding the Process

After you submit your project, LocusPilot runs through 9 phases to build your complete website.

What topical research actually does

Before any page is written, LocusPilot runs a dedicated 9-step procedure: it decides your homepage role, scores every service on commercial value and intent, maps the buyer journey per priority service, expands and filters a topic universe, then assembles the final hub + support-page architecture.

The output is a topic map tied to every stage of your customer journey, not a list of random blog ideas. Ranking for local businesses comes from topical authority (hub pages plus supporting guides that cover the journey), not publishing volume.

Example: for an aircon company, "cost" isn't one generic post. It's a state-level cost page, geo-specific quote sections inside each service hub, and process / concern / comparison guides feeding links back. That's the cluster search engines reward, and it's what topical research builds for you.

Two Generation Modes

With Review (Default)

Pauses after Phase 2 (Structure Generation) so you can review and approve the site structure before continuing. Good for client work.

Auto-flow

Runs all 9 phases automatically without stopping. Best when you trust the AI to make good decisions.

The 9 Phases

1
Topical Research

Maps your services to the buyer journey and plans the hub and support-page architecture

2
Structure Generation

Turns the research into the site structure you review (Phases 1 and 2 take about 15-20 minutes together)

3
Website Creation

Generates all pages, content, and components

4
Visual Optimization

Fixes layout issues and improves visual consistency

5
Image Generation

Creates and places AI images throughout the site

6
Content Optimization

Polishes blog posts and improves readability

7
Enhancement

Adds internal links (5 strategies), advanced schema, and EEAT signals

8
Location Pages

Creates pages for each service area (if applicable)

9
Final Integration

Deploys to preview and sends completion notification

Website Generation Progress with all 9 phases listed and Phase 1: Topical Research running

Timeline

Setup timeLess than 10 minutes
Generation time1-2 hours (runs in background)

You will receive email notifications at key points. Once complete, you can view your preview site immediately.

If a phase fails, the status page marks it in red and shows a Retry Project button.

Website Generation Progress with Phase 5: Image Generation marked failed and a Retry Project button
Failed generation· The failed phase is marked and Retry Project restarts the build
Status page reading Ready for Review after Phases 1 and 2, with the Review Structure button
Structure review page with the credit estimate and the Authors card
06

After Generation

Once your website is ready, you have several options for viewing, downloading, and editing it.

Preview Your Site

Your site is deployed to a preview URL on Cloudflare Pages. This preview is for testing and review only. When you are ready to go live, you will need to deploy to your own hosting.

Download Options

Full Source Code

Download the complete Astro project with all source files. Best for developers who want to make custom modifications.

Static HTML + Images

Download ready-to-deploy HTML, CSS, JS, and images. Works on any hosting platform.

Deploy to Your Own Hosting

To go live with your own domain:

  1. 1. Set up your own Cloudflare Pages account (free)
  2. 2. Connect your domain to Cloudflare
  3. 3. Deploy the downloaded files directly to your site
Completed project status page with the Publish and export options

Check the Final Numbers

Open Technical details on the status page to see the page counts, the SEO checks and the credit settlement: deposit paid, final cost and the balance charged or refunded.

Technical details panel with page statistics, strategy, SEO implementation checks and a credit summary of 47 deposit, 92 final cost, 45 charged
Technical details· Generation summary, SEO checks and credit settlement

Use Our Free Hosting (Recommended)

The easiest option: keep your site on our Cloudflare Pages hosting and simply connect your custom domain. No downloads or setup required.

Free Forever

Your website stays hosted on our infrastructure at no additional cost. Just point your domain to our servers.

  • ✓Free SSL certificate (HTTPS)
  • ✓Global CDN for fast loading
  • ✓Automatic deployments when you edit

How to Connect Your Domain:

  1. 1Go to your project status page and open "Connect your domain" under Finish setup
  2. 2Enter your domain (e.g., yourbusiness.com)
  3. 3Add the CNAME record to your DNS provider
  4. 4Wait for DNS propagation (usually 5-30 minutes)
Finish setup card with Connect your domain expanded, a domain field and an Add Domain button
Connect your domain· Enter the domain under Finish setup, then add the DNS record it shows you

Quick Editors for Minor Changes

For small updates, use the built-in editors in your dashboard:

Images

Replace or regenerate any image

Blog

Edit posts, fix typos

Services

Update pricing, descriptions

Locations

Edit service areas

Theme

Colors, fonts, styling

Settings

Domain, GTM, custom scripts

Edit website overview with a card for each editor

Each editor is a tab under Edit website:

Image Manager tab with All, Placeholders, Broken and Generated filters and a Replace button on each image
Images· Filter to Placeholders or Broken, then Replace
Blog editor with a post open: title, meta description, category and tags on the left, the rich text body on the right
Blog· Edit the post body, meta description, category and tags
Services tab listing six services, each with a tagline, a Featured marker and an Edit button
Services· Open any service to edit its copy
Service Areas tab listing seven locations marked Primary or Secondary, each with an Edit button
Locations· Primary and secondary service areas, each editable
Theme tab with editable primary, secondary and accent brand colors and read-only typography
Theme· Brand colors save directly. Fonts and layout are read-only here
Site Settings tab with Domain, Lead Recipient contact email, Spam Protection, Analytics and custom script sections
Settings· Domain, lead email, GTM and custom scripts

Regenerate an image or make it real

Every image in the Images tab has a Regenerate button next to Replace. Use it when an image is close but wrong, or when it looks obviously AI-made. The popup has two tabs.

Regenerate

Shows the prompt the image was made with. Change a few words (or leave it as is), pick a model and click Generate. The model list starts on the model you last generated with (the first time, the model the image was made with).

Flux 0.05 credits, Seedream 0.05, Nano Banana 0.1, Ideogram 0.1, GPT Image 0.15.

Make it real

Finds what gives the image away as AI (extra fingers, stiff poses, twisted railings, garbled signs) and makes a new, similar photo with those parts drawn right. It aims for an everyday phone snap, not a polished shot, so the angle, framing and light can change.

Seedream, Nano Banana or Ideogram 0.1 credits per run, GPT Image 0.15. Edit the fix prompt it shows you and click Regenerate to run your version.

  • Two options sit under the model list. Use the current image as a reference keeps the new image close to the old one (every model except Flux). Similar shot rewrites the prompt into a fresh take on the same scene, with a new angle, framing and small details. Each Generate gives a different version.
  • A new image takes 10 to 60 seconds. You can close the popup while it works; reopen the same image to pick it up.
  • Every Generate or Regenerate click is charged. Apply is free. If a generation fails, the credits go back to your balance.
  • Apply crops the new image to the exact size of the old one and saves it under the same file name, so every page that uses the image gets the new version. The card shows Updated until you click Publish.
  • Placeholder images can't be regenerated. Use Replace to upload one instead.
  • If the original prompt can't be found (some older images), the prompt box opens with a suggested prompt built from the page title and alt text. Edit it before you generate.

After making changes, click Save then Publish. Updates typically go live in 2-5 minutes.

07

SEO Optimization Features

Every generated website includes advanced SEO optimizations built in. These features are configured automatically during generation. No manual setup required.

EEAT Author Personas

Named authors with credentials, bio boxes on blog posts, and Person schema markup. AI generates realistic personas when no team info is provided.

Internal Linking Strategies

5 topology presets: homepage-focused, pillar-cluster, service-push, location-push, or flat. Controls where ranking power flows.

Learn more →
EEAT author personas with credentials and bio
EEAT Author Personas· Named authors with credentials and bio boxes
Internal linking strategy configuration
Internal Linking Strategy· 5 topology presets to control ranking power flow
Content Depth Presets

Standard, Comprehensive, or Authority mode. Controls word count, FAQ depth, and detail level across all pages.

Learn more →
Entity Injection

AI identifies topic-relevant entities and weaves them into content. Ensures comprehensive topical coverage for every page.

Content depth presets - standard, comprehensive, authority
Content Depth Presets· Standard, Comprehensive, or Authority mode
Entity coverage with editable topical terms per service
Entity Coverage· Topical terms per page, editable during review
Advanced Schema Markup

20+ schema types including GeoCircle service areas, Offer catalogs, Person credentials, knowsAbout, and sameAs for entity disambiguation.

Freshness & Reading Time

Content freshness signals with dateModified in schema and per-page sitemap priority. Blog posts include auto-calculated reading time estimates.

All features are automatic. These optimizations are applied during the generation process. You can customize internal linking strategy and content depth during structure review.

08

Making Major Changes

The quick editors handle most common changes. For bigger modifications, you can use the AI Site Agent directly in your browser, or download the source code and use a local AI coding tool.

Local AI Tools (For Advanced Users)

If you prefer more speed and control, download your source code and use a local AI coding tool:

Cursor

AI-first code editor based on VS Code. Great for making targeted changes with natural language prompts.

Claude Code

Terminal-based AI assistant. Powerful for complex modifications and multi-file changes.

Google Antigravity

IDE with Gemini built in. Good all-around option for code editing with AI assistance.

Download source code and edit with AI Code Assistant

Example Prompts

Here are some prompts you can use with AI coding tools:

"Add a WhatsApp chat button in the bottom right corner"
"Create a new testimonials slider on the homepage"
"Add a mortgage calculator tool to the sidebar"
"Update all pages to show the new phone number"

About the Codebase

Your website is built with Astro and MDX. This modern stack works well with AI coding tools. Content is stored in markdown files, making it easy to find and edit specific pages.

09

Expanding to New Cities

Once your hub site is live and performing well, you can expand into new cities at a fraction of the original cost. Our Hub & Satellite strategy lets you launch city-specific websites on exact-match domains, each with fully rewritten content and AI-generated homepage images.

10
Credits per city

No monthly fees. Build once, it's yours.

100%
Unique content

Every blog post and service page rewritten for the city.

~5 min
Deploy time

Pick a city, point a domain, deploy automatically.

How it works

  1. 1.Build your hub site as normal. This is your authority-building parent site.
  2. 2.Go to Satellite Sites, select the parent project, and choose a new city to target.
  3. 3.AI rewrites all content with local context, regenerates homepage images, and adds local schema markup.
  4. 4.Connect your exact-match city domain. Free SSL included via Cloudflare.

This is not programmatic SEO or spun content. Each satellite is a legitimate local business website that Google treats independently. The parentOrganization schema links satellites back to your hub, building a connected authority network.

Read the Full Strategy Guide
10

FAQs & Support

AI-generated websites are powerful but not perfect. Here's what to expect and how we support you.

How long does generation take?

Each website goes through 8 resource-intensive AI phases, and we run a limited number of generators to maintain quality. Typical generation takes 1-2 hours after you submit (or approve the structure if using review mode). During busy periods, it may take longer.

Why does it take this long?

  • •No templates: Every website is built from scratch based on your factsheet
  • •Custom images: Each image is AI-generated specifically for your content and context
  • •50+ AI agents: Multiple specialized agents fine-tune content, SEO, images, and code quality

Good news: Generation runs in the background. You can track real-time progress on your project status page, and you'll receive an email with the preview link when it's ready. If any phase fails, our team is notified and intervenes manually to resolve the issue.

Is the generated website 100% perfect?

While our AI produces high-quality websites, minor imperfections may occur occasionally. These typically include:

  • Small typos or awkward phrasing in content
  • Minor spacing or alignment inconsistencies
  • Placeholder text that wasn't fully replaced

Good news: Most minor issues can be fixed easily using our built-in Quick Editors (Blog, Services, Theme editors) without any coding knowledge.

What about AI-generated images?

AI image generation has improved significantly, but occasional odd results can still occur:

  • Unusual hand positions or extra fingers in people
  • Text in images that doesn't make sense
  • Objects with slightly distorted proportions

Tip: Nano Banana (Smart Visual) generally produces better quality images and supports reference images to match your brand style.

Use the Image Manager in your dashboard to easily replace any problematic images with your own photos or regenerated alternatives.

What if there's a broken layout?

In rare cases, you might encounter layout issues like overlapping elements or broken sections. This is uncommon but can happen with complex designs.

Our Guarantee:

If you encounter a broken layout that cannot be fixed with the Quick Editors, contact us and we will fix it for you using our AI coding assistant tools at no extra charge.

Please include your project name and describe the issue. Screenshots are helpful.

What's included with my website?

  • Full source code ownership (Astro + MDX)
  • AI-generated images tailored to your business
  • SEO optimization (20+ schema types, meta tags, internal links)
  • EEAT author personas with Person schema
  • 5 internal linking strategy presets
  • Content depth presets with entity injection
  • Content freshness signals and blog reading time
  • Preview deployment on Cloudflare Pages
  • Quick Editors for post-generation changes
  • Support for layout issues (contact us)

What if my balance goes negative?

If the actual page count is higher than estimated, the additional credits are charged from your balance. If this causes your balance to go negative:

  • Your website preview remains accessible
  • Downloads (source code and static HTML) are locked
  • Quick Editors remain accessible for minor changes

To unlock downloads: Purchase credits to bring your balance back to zero or positive. Downloads are automatically unlocked once your balance is settled.

How do I receive emails from my contact form?

Your website uses FormSubmit, a free form handling service. The first time someone submits your contact form, you need to activate it:

One-Time Activation Steps:

  1. 1Someone submits your contact form (you can test it yourself)
  2. 2Check your email inbox for a message from FormSubmit
  3. 3Click the "Activate Form" link in the email
  4. 4Done! All future form submissions will be delivered to your email

Note: Check your spam/junk folder if you don't see the activation email. The email comes from FormSubmit, not your website domain.

How do I know the exact cost before generation?

Choose "Review Structure" mode during submission. After Phase 1, you'll see the exact page count and final cost. You can approve or request changes to reduce the scope before generation continues.

How it works: Only 70% is charged upfront. Final settlement happens after generation based on actual pages delivered.

Why can't I add new pages from the dashboard?

Your website is a real codebase, not a locked template. This gives you unlimited flexibility. Use AI coding tools like Google AntiGravity (free), Cursor, or Claude Code to add pages, features, or completely redesign sections. Just describe what you want in plain English.

The Quick Editors handle simple updates; AI tools handle everything else. You're never limited by what a dashboard allows.

Do I need to pay for AI coding tools?

Not necessarily. Google AntiGravity is completely free. It's an AI-powered IDE with Gemini built in, and it's sufficient for most edits. Cursor and Claude Code also offer free tiers.

For professional use, paid plans offer more capacity, but you can get started without spending anything.

How do I connect my custom domain?

The easiest way: use our free hosting. Go to your project status page, find "Custom Domain", enter your domain, and add the CNAME record to your DNS provider. Your site stays on our infrastructure at no cost.

Free SSL, global CDN, and automatic deployments included.

View detailed guide

How do I add new blog posts after generation?

Use AI coding tools like Google AntiGravity (free), Cursor, or Claude Code. Simply prompt: "Add a new blog post about [topic]" and the AI creates the file, adds proper frontmatter, and updates any indexes.

It's faster than any CMS and you maintain full control over formatting. The Blog Editor in the dashboard is designed for editing existing posts.

Which languages are supported?

LocusPilot generates websites natively in 10 languages: English, Spanish, Portuguese, German, French, Polish, Dutch, Malay, Chinese Simplified, and Chinese Traditional. Content is generated from scratch in your chosen language - not translated after the fact.

For English websites, spelling is automatically adjusted based on your business country (US, UK, AU, CA variants).

See Section 01: Creating Your First Project for the full list and details on English regional variants.

How does language selection work?

Select your target language from the Website Language dropdown in the New Project form. The entire website (all pages, blog posts, CTAs, FAQs, and service descriptions) will be generated natively in that language.

Technical identifiers (file names, YAML field names, code comments) remain in English for compatibility.

Need a language we don't support yet? Generate your site in English, then use AI coding tools (Cursor, Claude Code) to translate. Prompt: "Translate all pages to [language]".

Why is my credit charge lower than my total page count?

Not all pages count toward your credit bill. 5 utility pages are excluded from billing: the 404 error page, Privacy Policy, Terms of Service, Sitemap, and the Services/Blog index page. These are standard pages every site needs and are not charged.

Example: If your site has 25 total pages, only 20 are billable. The credit cost is calculated on the 20 billable pages.

Will Google index my preview site?

No. All preview sites on our pages.dev domain have a noindex tag automatically applied. This prevents Google from indexing your preview while you're still reviewing it.

SEO-ready when you go live: When you download the source code or republish to your own Cloudflare Pages account, the noindex tag is not included. You get the original SEO-optimized code ready for search engines.

Want complete peace of mind? You can delete your preview site anytime from the Project Settings page. This completely removes the preview from our servers.

In Summary

LocusPilot generates production-ready websites that work great out of the box. While AI isn't perfect, most issues are minor and easily fixable. For anything you can't fix yourself, our team is here to help.

Ready to create your first website?

Get started in minutes. Your complete, SEO-ready website is just a few clicks away.

Start buildingSee pricing